Optimal System Protection
Hankison’s DHW Series Wall Mount Desiccant Air Dryers protect moisture sensitive applications requiring low pressure dew points. Delivers dew points of ISO 8573-1: 2010 Class 1 (-100 ºF, -73 ºC) and Class 2 (-40 ºF, -40 ºC) with flow rates of 7 to 50 scfm (12 to 85 nm³/h).
Hankison’s DHW Series Wall Mount Desiccant Air Dryers protect moisture sensitive applications requiring low pressure dew points. Delivers dew points of ISO 8573-1: 2010 Class 1 (-100 ºF, -73 ºC) and Class 2 (-40 ºF, -40 ºC) with flow rates of 7 to 50 scfm (12 to 85 nm³/h).
Unit of Measure
Specifications
Inlet Flow Capacity at -40 ºF (-40 ºC) |
N/A 30 scfm51 nm³/h |
Inlet Flow Capacity at -100 ºF (-70 ºC) |
N/A 24 scfm41 nm³/h |
Inlet Connection Size |
N/A 0.5 in |
Outlet Connection Size |
N/A 0.5 in |
Inlet Connection Type |
N/A NPT |
Outlet Connection Type |
N/A NPT |
Height |
N/A 31.6 in |
Width |
N/A 24.37 in |
Depth |
N/A 8.54 in |
Weight |
N/A 93 lb |
Industry Standards/Certifications |
N/A Compressed Air and Gas Institute (CAGI) ISO 8573-1:2010 |
Series |
N/A DHW |
Brands |
N/A Hankison® |
Dew Points of ISO 8573-1: 2010 Class 1 |
N/A -100 ºF-73 ºC |
Dew Points of ISO 8573-1: 2010 Class 2 |
N/A -40 ºF-40 ºC |
Supreme Craftsmanship
Standard Cord Set Size |
N/A 6 ft1.8 m |
Furnished in Cabinet for Easy Wall Mounting |
N/A
|
Front Mounted Control Panel |
N/A
|
Highly Accurate Solid State Timer |
N/A
|
Optional NGF Series Filter Packages |
N/A
|
Technology at a Glance
Technology at a Glance |
N/A
|
How it Works
How it Works |
N/A
Compressed air enters the dryer and is directed to Tower 1 by valve (A), and then to the dryer outlet through shuttle valve (B). A portion of the dried air is throttled to near atmospheric pressure by means of orifice (C). This extremely dry, low pressure air flows through and regenerates the desiccant in Tower 2 and is exhausted through purge/repressurization valve (D) and exhaust muffler (E) to atmosphere. After a set time, the automatic solid state timer closes purge/ repressurization valve (D) allowing Tower 2 to repressurize slowly. At the end of 2 minutes, valve (A) shifts and purge/repressurization valve (D) reopens. The main air flow is now dried by Tower 2 while Tower 1 is being regenerated. |